Special Yarn Textile Machinery Manufacturer

Chenille Machine, False Twist Machine, Yarn Splitting Machine, Winding Machine,Yarn Solutions

Sunny:+8613567545633

Addie:+8615158268930

News

False Twist Machine New Machine Calibration and Twist Precision Debugging Method

  • Category:
    FAQS
  • Release time: 2026-09-01

False Twist Machine New Machine Calibration and Twist Precision Debugging Method

New false twist machine commissioning relies on standardized twist calibration procedures, which directly determines finished yarn twist uniformity and mass production stability.
All new false twist machine equipment requires three-point twist calibration before formal operation, covering low, medium and high twist parameter intervals of 500T/M, 2000T/M and 3500T/M.
Lanxiang Machinery commissioning standards require calibrated twist error controlled within ±12T/M, 20% higher precision than ordinary industry debugging thresholds.
Idle preheating operation for 30 minutes is mandatory before calibration, eliminating 95% of twist drift caused by cold machine mechanical hysteresis.
Belt tension adjustment during debugging must maintain 25N standard tension value, preventing speed deviation induced twist fluctuation in high-speed operation.
New machine calibration needs 5 groups of continuous sampling detection, with qualified rate required to reach 100% before batch yarn processing.
Unstandardized new machine debugging will cause long-term twist instability, raising finished yarn defect rate by 5.8% in subsequent production.
After formal commissioning, false twist machines need secondary precision calibration after 7 days of continuous trial operation.
The calibration temperature environment is fixed at 25℃±3℃, avoiding thermal expansion affecting transmission component operating accuracy.
Standardized new machine twist debugging can extend the stable operation cycle of false twist equipment by 40% annually.

FAQ

Q1: How many calibration points are required for new false twist machines? A: Three-point calibration covering 500T/M, 2000T/M and 3500T/M full range parameters.
Q2: What is the allowable twist error after new machine calibration? A: The standard error is controlled within ±12T/M to ensure high-precision yarn processing.
Q3: Why preheat the machine before twist calibration? A: 30-minute preheating eliminates 95% of twist drift from cold machine mechanical hysteresis.
Q4: When to perform secondary calibration for new false twist machines? A: Secondary precision calibration is required after 7 days of continuous trial operation.
Q5: What temperature is suitable for false twist machine calibration? A: A constant environment of 25℃±3℃ guarantees calibration accuracy.
url: https://www.zjlxjx.com/news/74.html